Hampton Public Safety Building
The project provided for the replacement of all the older heat pumps remaining in the building. It also included the replacement of all of the systems condensate drain piping, as well as the addition of auxiliary drain pans to include trap and pan switches to shut down the unit should an overflow occur for all new and existing units. A dedicated split system was added to the emergency power system to maintain environmental control of the police departments' main server.
Hampton, VA
Coastal Engineering © 2011